1 Cubic Metre in Cubic Feet (cft): m³ to cft for Site Work

One cubic metre cube with 3.281 ft sides equal to 35.31 cubic feet

1 cubic metre (m³) is equal to 35.3147 cubic feet (cft). Going the other way, 1 cft is 0.0283 m³, so 100 cft of sand is about 2.83 m³.

Drawings and rate analysis in Nepal are mostly in metric units, but sand, gitti and stone are often ordered in cft on site. This quick guide shows the conversion and gives a table you can use at the site.

Why 1 cubic metre equals 35.3147 cft

1 foot = 0.3048 m exactly, so 1 m = 1 ÷ 0.3048 = 3.28084 ft.

A cube 1 m on each side is 3.28084 ft on each side. Its volume in cubic feet is 3.28084 × 3.28084 × 3.28084 = 35.3147 cft.

The reverse: 0.3048 × 0.3048 × 0.3048 = 0.0283168 m³ in one cft.

1 m³ = 35.31 cft 1 m = 3.281 ft 1 m = 3.281 ft 1 m 3.28084 × 3.28084 × 3.28084 = 35.3147 cft 1 cft = 1 ft × 1 ft × 1 ft = 0.0283 m³ m³ to cft: multiply by 35.31 cft to m³: multiply by 0.0283
A one metre cube holds about 35.31 cubic feet because each edge is 3.281 ft.

m³ to cft conversion table

Cubic metresCubic feetCubic feetCubic metres
0.517.66501.416
135.311002.832
270.631504.248
3105.942005.663
5176.573008.495
10353.1550014.158

Sand and gitti loads in cft

Suppliers often sell sand and aggregate by the "trip" or "load", quoted in cft. The volume of a trip is not a fixed standard. It depends on the tractor trailer or tipper body size, and on how high it is heaped. Two suppliers can mean quite different amounts by "one tipper".

The safe way is to measure the body yourself. Example: a box 10 ft long, 6 ft wide and filled 2 ft deep holds 10 × 6 × 2 = 120 cft, which is 120 × 0.0283168 = 3.40 m³. Also remember that damp sand bulks up, so the same weight of sand can show more cft when wet.

Worked example

An excavation pit is 3 m × 2 m × 1.5 m deep. Volume = 9 m³ = 9 × 35.3147 = 317.83 cft. Loose soil after digging takes more space than this, so plan disposal trips with some margin.

The engineering unit converter handles volume, area and length. For digging volumes, the excavation and earthwork calculator does the sum, and the concrete calculator gives sand and aggregate in both m³ and cft.

Measuring a sand or gitti heap in cft

When material is tipped on site you can check the quantity yourself before signing the delivery note. Two shapes cover most heaps.

Example 1: a cone-shaped heap

A tipper leaves a round heap 3.0 m across at the base and 1.2 m high. Volume of a cone = π × r² × h ÷ 3 = 3.1416 × 1.5 × 1.5 × 1.2 ÷ 3 = 2.83 m³. In cft: 2.83 × 35.3147 = about 100 cft. Measure the diameter in two directions at right angles and take the average, because heaps are rarely round.

Example 2: a long heap with sloping sides

Aggregate stacked along the boundary is 4.0 m × 2.5 m at the base, 2.0 m × 0.5 m on top and 1.0 m high. Use the prismoidal formula: V = h ÷ 6 × (A1 + 4 Am + A2), where Am is the area at mid-height (3.0 m × 1.5 m).

  • A1 = 4.0 × 2.5 = 10.0 m², A2 = 2.0 × 0.5 = 1.0 m², Am = 4.5 m²
  • V = 1.0 ÷ 6 × (10.0 + 18.0 + 1.0) = 4.83 m³ = 170.7 cft

The common shortcut of averaging the top and bottom areas gives (10.0 + 1.0) ÷ 2 × 1.0 = 5.5 m³, about 14% more than the heap really holds. On a stack of this shape the shortcut always favours the supplier.

Stacking aggregate into regular shapes with flat tops before measuring makes this much easier; many site engineers ask suppliers to unload into a timber or brick bay of known size.

Converting rates between per m³ and per cft

Municipal rate analyses in Nepal give rates per m³, while suppliers quote per cft or per trip. Convert both to the same unit before comparing.

  • Rate per m³ = rate per cft × 35.3147. Example: Rs 100 per cft (an example figure) = Rs 3,531 per m³.
  • Rate per cft = rate per m³ ÷ 35.3147. Example: manual earthwork in ordinary soil at Rs 529 per m³ in the Suryabinayak Municipality rate analysis 2081/82 is Rs 14.98 per cft.

Common site quantities in both units

Itemm³cft
Sand for 1 m³ of M20 concrete (1:1.5:3, dry factor 1.54)0.4214.8
Aggregate for 1 m³ of M20 concrete0.8429.7
A trailer body 12 ft × 6 ft filled 1.5 ft deep3.06108
Footing excavation for 12 pits of 2.1 × 2.1 × 1.5 m79.382,803
Concrete in one 4.23 × 3.73 m slab panel, 125 mm thick1.9769.6

The M20 figures come from our cement bags for 1 m³ of M20 concrete guide and the slab panel from the RCC slab quantity example.

Common mistakes with m³ and cft

  • Using 35 or 35.5 as the factor on large jobs. On 80 m³ of excavation, using 35 instead of 35.3147 loses 25 cft.
  • Converting length first and then rounding. 2.1 m written as 6.9 ft and then cubed adds error. Work out m³ first, then multiply by 35.3147 once.
  • Comparing loose and solid volumes. Dug soil swells and damp sand bulks, so a trip of loose material is not the same as the same cft in the ground or in a dry, compacted state. Ask whether a rate is for solid or loose measure.
  • Assuming every "trip" is the same. Measure the body of the vehicle that actually comes, inside dimensions, and the height of the load.
  • Mixing cubic feet with square feet. Plaster and tiles are in sq ft or m²; sand, gitti, concrete and earthwork are in cft or m³.

Frequently asked questions

Is 1 m³ equal to 35.5 cft?

No. The correct value is 35.3147. Some people round it to 35.3 or 35.31, which is fine. 35.5 is off by about half a percent.

How many cft in 1 cubic yard?

1 cubic yard is 3 × 3 × 3 = 27 cft, or 0.7646 m³.

How many litres in 1 cft?

1 cft is about 28.32 litres, since 1 m³ is 1000 litres.

Preparing for the NEC licence or Lok Sewa?Practise 2,100+ civil engineering MCQs with answers, free.Start practising

Comments

Need a calculator we don’t have yet?

Tell us what you use on site or in class. The most requested tools get built next.