Cost Estimation of Road:

Cost Estimation of Road


Cost Estimation of any construction works and projects are very necessary to forecast the probable cost that is to be spent for its completion. It is also very helpful to identify the different types of expenditures and cost which are categorized in different subdivisions. This helps to minimize the cost and time of completion as well as maximize the work performance and also an appropriate and adequate supply of materials and laborers required for the project. 

In Highways, a different subdivision of works are done any Quantity and Cost Estimation of each different Activities or works are done separately which combined as last to get the final Detail Quantity Estimate, Abstract of Cost and Summary of Total Cost.

An Example of a Simple Road Construction Estimation is provided here. Breakdown of Simple Road Construction Work is as follows:
Detail Cost and Quantity Estimation of Road

  1. EARTHWORK CALCULATIONS FOR ROADWAY
  2. EARTHWORK CALCULATIONS FOR DRAINS
  3. QUANTITY CALCULATIONS FOR GABION RETAINING WALL
  4. Masonry Retaining Structure Quantity Calculation
  5. Masonry Retaining Structure Quantity Calculation
  6. Quantity Estimation of DRAIN
  7. QUANTITY CALCULATION OF COVER FOR SIDE DRAIN
  8. MATRICES OF CROSS DRAINAGE WORKS
  9. Quantity Estimate of Pipe Culverts
  10. Quantity Estimate of Slab Culverts
  11. QUANTITY CALCULATIONS FOR PAVEMENT
  12. Summary of Rate
  13. RATE ANALYSIS
  14. RATE ANALYSIS FOR MAINTENANCE WORKS
  15. Chart for the collection of materials
  16. Norms for the collection of materials by machine
  17. TRANSPORTATION RATES FOR HAULAGE OF SOIL AT DISPOSAL SITES
  18. Transportation Analysis of Construction Materials
  19. Material Rates
  20. DETAIL QUANTITY ESTIMATE
  21. ABSTRACT OF COST
  22. SUMMARY OF COST


Download Excel Spreadsheet of All Above Works in one Single File

12 comments:

  1. please i need the calculstion sheet of the the road project free way in word

    ReplyDelete
  2. Before beginning any paving project you need to answer a few questions, whether it be a paved driveway, a driveway border, a paving path, garden edging, Paving Amarillo TX

    ReplyDelete
  3. Thank you very much for this useful article. I like it. excel budget spreadsheets

    ReplyDelete
  4. total estimated cost = 200 lakhs for kulekhani II hydropower station
    1240 lakh kulekhani II hydropwer station according to statistics

    Hello fellow engineers and brothers and sisters, according to the website
    https://theeverestlist.org/lists/top-10-hydropowers-of-nepal
    Our total cost is NPR 1240 lakh along with financial aid of JAPAN, but
    I found only estimated NPR 200 lakhs that has been spent.
    Could you guys recheck for what is the actual total cost of the project?

    ReplyDelete
    Replies
    1. Can you plz teach me how to make quotation

      Delete
  5. Black-top Paving offers better natural versatility over concrete concerning overseeing strain and breaking.
    pavement maintenance

    ReplyDelete
  6. Very helpful blog, really liked it

    ReplyDelete
  7. Thank you very much for this useful article.<a href= "https://www.tastyplus.com.np/2023/05/nepal-to-host-t20-world-cup-asian-qualifiers.html> I liked it</a>

    ReplyDelete

  8. Thank you very much for this useful article.<a href= "https://www.tastyplus.com.np/2023/05/nepal-to-host-t20-world-cup-asian-qualifiers.html>I liked it</a>

    ReplyDelete
  9. Thank you very much for this useful article.I liked it

    ReplyDelete

'; (function() { var dsq = document.createElement('script'); dsq.type = 'text/javascript'; dsq.async = true; dsq.src = '//' + disqus_shortname + '.disqus.com/embed.js'; (document.getElementsByTagName('head')[0] || document.getElementsByTagName('body')[0]).appendChild(dsq); })();